Map Who Owns Each Step Before Move-In
Before move-in, map each part of the sequence to an owner: freight delivery, material handling, required venue or show services, booth installation, technical integration, and final exhibitor readiness. Depending on the event, those roles may involve the carrier, general service contractor or material-handling provider, OCCC or other official show services, an installer or EAC, AV or technical teams, and the exhibitor. The key is knowing where one party’s responsibility ends and the next party can actually begin; a carrier may complete delivery while the installation crew is still waiting for the shipment to reach the booth.
Those owners, deadlines, and service conditions should come from the current show documents. The exhibitor manual guide explains how to turn them into project actions before move-in.

Freight arriving at OCCC does not mean it is already available at the booth. Receiving and material handling must be completed before the installation crew can fully begin.
From Carrier Arrival to Freight at the Booth
Freight arriving at OCCC is not the same as freight being available at the booth. A shipment may first pass through an advance warehouse or direct-to-show receiving process before it is unloaded, checked in, and transferred to the exhibit space.
Transportation gets the shipment to the designated receiving point; material handling covers the on-site movement that follows, which may include unloading, booth delivery, empty-container handling, and reloading packed freight for outbound shipment. An installation crew can therefore be ready while the exhibit materials are still moving through the receiving process, and the main build cannot fully begin until the components the crew needs are physically available in the booth space.
When Can Installation Actually Start?
An installation crew can be on-site without having the conditions needed to start meaningful work. Freight and structural components need to be accessible, the booth space needs to be workable, and any flooring conditions that affect the build should already be clear.
Required services and equipment access also have to line up with the installation sequence. Power locations, rigging, utilities, and equipment clearances should be confirmed where they affect the structure, and a large product or demo system may need to enter the booth before walls, counters, or other elements restrict the access path. Once those conditions are in place, on-site installation and dismantle can move from scheduled labor into the booth build itself.
When Can AV, Equipment, and Demo Teams Start?
AV, equipment, and demo teams can begin once the parts of the booth that affect their work are stable. Screen positions and mounting points should be set, required power should be accessible, cable paths should remain open, and equipment still needs a clear route into the space.
Starting too early creates rework. Screens may move, cables may need rerouting, or equipment may have to be disconnected and tested again as the booth changes. The technical team should take over when its work can proceed without the main build repeatedly disturbing it.
What Can Hold Up the Next Team?
Move-in delays often begin with an unresolved dependency rather than with the next crew working too slowly. One blocked condition can shift several later tasks.
Blocker | Immediate Effect | Downstream Effect |
|---|---|---|
Freight is not available at the booth | Main installation cannot fully begin | Technical setup shifts later |
Required power location is unresolved | Structure or fixtures cannot be finalized around service access | AV or demo integration may be delayed |
Required rigging is not complete | Overhead installation remains open | Work below or around it may need to be resequenced |
Equipment arrives late | Demo integration remains incomplete | Final show-ready testing is held up |
Required network service is unavailable | The physical build may still finish | Connected demos or systems remain non-operational |
Track the condition that releases the next team, not just the start time on the schedule. A crew can be booked and present while the work it depends on is still blocked.

A physically completed booth is not automatically show-ready. AV, equipment, power, network-dependent systems, and final operating checks still need to be completed before opening.
Built Does Not Mean Show-Ready
A booth can be physically complete without being operationally ready. Structure, flooring, counters, fixtures, and graphics may all be finished while the systems the exhibitor relies on are still being connected, tested, or adjusted.
Power, lighting, screens, network-dependent demos, product placement, and lead capture still need to work as intended. Staff also need practical access to storage, counters, equipment, and visitor areas. The booth is show-ready when it can support normal show-hour activity, not simply when the build looks finished.
Move-Out Runs the Chain in Reverse
Move-out follows the same logic in reverse. Technical teams shut down AV, demo systems, and equipment first; the installation crew can then dismantle and pack the exhibit. Once the shipment is packed and released, material handling moves it toward the outbound carrier.
That sequence should be planned before the show opens, not after the hall closes. Carrier arrangements, packing order, empty-container return, and outbound paperwork should already be clear so the final transfer does not create an avoidable delay.
FAQ
Does freight arrival at OCCC mean the crates are already at my booth?
No. Freight may still need to pass through receiving and material handling before it reaches the exhibit space. Installation can fully begin only after the required components are physically available to the crew.
Who moves freight from receiving to the booth?
For events using an appointed material-handling provider, that contractor handles the on-site movement from receiving to the booth. The responsible provider and procedure vary by event, so the current exhibitor manual or service kit should be checked before shipping.
When can the booth installer actually start work?
Meaningful installation can begin once the required freight is accessible, the workspace is available, and any flooring, utility, rigging, or equipment conditions that affect the build are clear enough to proceed without unnecessary rework.
Should AV and demo equipment be installed before the booth structure is complete?
Not necessarily. Technical work should begin once the structure, mounting locations, power access, cable routes, and equipment positions that affect the installation are stable enough that the technical team will not need to undo its work later.
Is a booth show-ready as soon as installation is finished?
No. A physically completed booth may still require power and lighting checks, screen or network testing, demo startup, product placement, lead-capture testing, and final staff-access checks before visitors arrive.
Are move-in procedures the same for every event at OCCC?
No. Contractors, receiving routes, deadlines, service providers, and move-in windows can vary by event. Use the current exhibitor manual or service kit for the requirements that apply to the specific show.