Make Responsibilities Visible at the Start
Booth projects involve decisions from the exhibitor as well as work by production, logistics and installation teams. A schedule becomes useful when each item has a responsible person, a required input and a clear completion condition.
At the start, identify the exhibitor's approval contact and the people handling the agreed work. Record what is already complete, which suppliers are involved and which dates are fixed by the event.
Workstream
Coordination needs
Design and structure
Current drawings, required reviews, approval contact and release status
Graphics
Templates, artwork owner, proof decisions and approved file versions
Production
Component scope, dependencies, checks and packing date
Freight and site work
Receiving route, documents, access, service orders and installation sequence
Handover and closeout
Review contact, open issues, repacking and the agreed next destination
Keep Approvals Attached to the Right Version
An approval needs to identify what was reviewed. We coordinate the relevant drawing or file revision, the decision and any conditions that remain open. Teams can then distinguish a concept under review from information released for production.
When the booth design changes, review the effect on graphics, components and technical requirements. The updated information should reach everyone responsible for the affected work before they proceed.
For artwork, record the assigned surface and approved file. For production details, keep the component reference with the drawing. These links make later questions easier to trace than an approval message without a revision or item reference.
Review Changes With Their Consequences
A change to one item can affect several workstreams. Moving a screen can alter a graphic, mounting detail, cable route and installation task. A different product can require new support or access space.
Change coordination should record:
The person authorized to approve it.
Any effect on cost, schedule and other teams.
The revised information and the next release decision.
Urgent requests still need a decision path. The project contact should know whether the team is reviewing a change, waiting for approval or carrying out approved work.
Schedule the Handoffs Between Teams
Project management focuses on the information needed between stages. Fabrication and prebuild checks need agreed component details and a record of items to resolve before packing. Shipping and logistics need the shipment information, receiving route and site schedule.
Before installation, confirm that the site team has the current drawings, component references, service information and an available decision contact. The installation team can then organize the work around the components and access actually available.
At handover, record completed checks and any remaining items separately. An issue should retain its owner and next action until it has been resolved and reviewed.

20x20 Custom Trade Show Booth at TPE 2023, Las Vegas, NV

20x20 Custom Trade Show Booth at SupplySide West 2023, Las Vegas, NV
Coordinate Show Services With Clear Authority
Electrical, internet, rigging and material handling may involve event-designated providers and ordering procedures. The project scope should identify who gathers requirements, who places the order, who approves the charge and who checks delivery.
Coordination also needs the current event instructions. Confirm submission deadlines and order status against the selected show rather than carrying forward an earlier event's arrangements.
Preparing the Same Exhibit for Another Show
When a booth will be used again, bring the next event into the discussion before the first dismantle. Record which components and graphics should be retained, the outbound destination and the time available for inspection or changes.
The storage, maintenance and reuse service addresses the assets themselves. Project coordination connects that work with the next layout, approval dates and delivery schedule. Each event still needs its own scope and venue review.

20x20 Custom Trade Show Booth at Shoptalk 2025, Las Vegas, NV

20x30 Custom Trade Show Booth at DevLearn 2023, Las Vegas, NV
A Booth With Several Connected Requirements
Blinkist's 20x30 DevLearn 2023 exhibit combined demo devices, display positions, visitor circulation and an installation plan at MGM Grand. The Blinkist case study offers a practical reference for the connected decisions a demo-led booth brings into a project.
For a complete Las Vegas exhibit, review our booth design and build services. For projects using a rental structure, start with trade show booth rental options.
FAQ
Frequently Asked Questions
Quick clarity on scope, timeline, and execution workflow
Who will be our main project contact?
The project arrangement identifies the contacts responsible for coordination and exhibitor approvals. Confirm how decisions, updates and urgent site questions should be routed. The contact structure should match the agreed scope and the people involved.
How often will we receive updates?
Can coordination include our existing designer or supplier?
Who approves additional work or a change in cost?
Does project management include buying all show services?
Can you coordinate work across more than one trade show?