Show Rules and Venue Rules Are Not the Same Thing
The exhibitor manual normally sets the requirements for the specific event. These may include booth classifications, display restrictions, submission deadlines, freight instructions, contractor procedures, approval requirements, and special conditions for products or demonstrations.
Venue procedures form a separate layer. They may affect loading access, fire and life safety, rigging, utilities, contractor access, and services controlled or coordinated by the facility.
An Exhibitor Appointed Contractor (EAC) is an outside contractor selected by the exhibitor and may need registration, insurance, credentials, or show approval. A General Service Contractor (GSC) may manage selected services such as material handling, decorating, or other event operations, depending on the show.
When organizers, GSCs, EACs, official providers, freight carriers, and exhibit partners are all involved, the U.S. trade show exhibitor guide explains how those responsibilities are typically divided.

Las Vegas exhibitors should confirm booth approval, contractor, freight, and official service requirements before production and shipping are finalized.
What Rule Categories Should Exhibitors Check?
Rule Category | What to Verify | Where to Confirm It |
|---|---|---|
Booth & display rules | Booth type, height, sightlines, covered areas, hanging signs, and special displays | Current exhibitor manual and show approval requirements |
Contractor & labor | EAC registration, COI, credentials, permitted work, and provider-controlled services | Exhibitor manual and contractor/EAC instructions |
Freight & material handling | Receiving route, advance warehouse or direct-to-show path, labels, deadlines, and material handling | GSC or official freight instructions |
Rigging, electrical & official services | Hanging, power, internet, service locations, and designated providers | Official service forms, provider instructions, and current show requirements |
Move-in & dismantle | Access windows, show-ready deadline, service timing, and move-out schedule | Exhibitor manual and current show schedule |
Venue & safety | Facility access, fire/life safety, loading, and venue-controlled procedures | Venue requirements together with the current show manual |
This table is a rules map, not a substitute for the current event documents. The same category can be handled differently from one show or facility to another.
Check Booth and Approval Rules Before Production
Some requirements can force physical changes to the booth, so they should be checked before structure and graphics are released for production.
Confirm the contracted booth type and the current rules for height, sightlines, overhead elements, hanging signs, covered areas, and special structures. Vehicles, machinery, batteries, sampling areas, enclosed spaces, or other unusual displays may introduce additional approval or safety requirements.
These issues are much easier to resolve while the booth can still be changed without affecting production. A drawing may look complete and still require revision if the relevant structural, hanging, utility, or special-display requirements have not been confirmed.
Confirm Contractor and Labor Requirements Before Scheduling Crews
A crew can be fully capable of installing a booth and still need event-specific authorization before work begins.
Before scheduling labor, confirm whether the planned contractor needs EAC registration, a Certificate of Insurance (COI), credentials, or another approval. A COI is proof of insurance that may be required as part of contractor registration.
Also confirm whether certain work scopes must be handled by official, designated, or exclusive providers rather than by the exhibitor's outside contractor. Structural installation, electrical work, rigging, material handling, and specialty services may follow different responsibility paths depending on the event.
Once contractor approval and work responsibilities are clear, Las Vegas booth installation planning covers how labor, freight availability, setup sequence, and dismantle come together on the show floor.
Verify Freight and Material-Handling Rules Before Shipping
Freight instructions should be checked before materials leave the warehouse.
Confirm whether the event uses an advance warehouse, direct-to-show receiving, specific freight labels, delivery windows, or other material-handling procedures. The responsible provider and receiving path should be clear before the carrier is dispatched.
A truck arriving at the venue does not necessarily mean the booth materials are available at the exhibit space. Freight may still need to move through the show's receiving and material-handling process.
If the issue shifts from understanding the freight rules to knowing when crates will actually become available at the booth, drayage and move-in planning covers freight release, dock access, crate order, and show-site handling.
Check Rules for Rigging, Electrical, Internet, and Official Services
Some booth requirements follow their own ordering, approval, or provider rules.
Before production and move-in, identify whether the booth needs:
overhead rigging or hanging signs;
electrical service;
internet or telecom;
specialty lighting or powered displays;
other event- or venue-controlled services.
Confirm both what service is required and who is authorized or designated to provide it. The applicable order form, deadline, approval path, and service location should be known before move-in.
An exhibit partner may help define or coordinate a requirement without being the company authorized to perform that service on the show floor. Keeping those responsibilities clear is especially important for electrical, rigging, internet, and material handling.

Move-in, material handling, venue procedures, and dismantle requirements should be checked against the current exhibitor manual for the actual event.
Confirm Move-In and Dismantle Rules Before the Show
Move-in has its own access windows, service timing, contractor requirements, show-ready deadlines, and move-out schedule.
Before setup begins, confirm when approved personnel can access the floor, when required services are expected, when booth materials should be available, and when the exhibit must be complete.
The same applies after the show closes. Dismantle windows and outbound timing should be known before crews and freight are scheduled.
Once access, timing, and service responsibilities are confirmed, the installation team can work from the actual show schedule instead of assumptions carried over from another event.
Recheck Requirements for the Assigned Venue and Event
A booth that worked at one Las Vegas event should not automatically be assumed to follow the same execution path at another.
LVCC, Venetian Expo, Mandalay Bay Convention Center, Caesars Forum, and other facilities can differ in access procedures, service requirements, rigging conditions, loading arrangements, and venue-controlled operations. The event itself may add another layer of requirements.
If the assigned venue is LVCC, the LVCC booth planning guide covers the venue-specific planning conditions behind those requirements.
Venue information is useful context, but the current exhibitor manual for the actual event should remain part of the final rules check.
Pre-Show Rules Check
Before the booth moves into final execution, confirm that:
The current exhibitor manual has been reviewed.
Booth and approval requirements are confirmed.
Contractor and EAC requirements are confirmed.
Freight and material-handling instructions are confirmed.
Official or exclusive services have been identified.
Move-in and dismantle windows are confirmed.
Venue-specific requirements have been checked against the current event.
The objective is not to collect more paperwork. It is to make sure every requirement that could delay approval, shipping, floor access, or setup has a clear source and owner.
Final Takeaway
The hardest part of Las Vegas trade show compliance is rarely finding one rule. It is knowing which party controls the requirement and making sure the current version is checked before it affects production, shipping, contractor access, or move-in.
Treat the exhibitor manual as the starting point, then confirm the venue, contractor, freight, and official-service requirements that apply to the actual event. That is more reliable than assuming a rule from another Las Vegas show will apply the same way.
FAQ
Do all Las Vegas trade shows follow the same booth rules?
No. Requirements can vary by event, venue, booth type, contractor arrangement, and service provider. Review the current exhibitor manual together with any relevant venue and provider instructions.
Can exhibitors install their own booths in Las Vegas?
It depends on the event, venue, booth scope, and applicable contractor or labor requirements. Confirm what exhibitor employees may perform and whether an EAC, official provider, or another approved contractor is required.
When should exhibitors start checking trade show rules?
Before the booth design is locked. Approval requirements, contractor rules, utilities, freight procedures, and special displays can affect decisions made well before move-in.
Where should exhibitors verify the current rules for a Las Vegas trade show?
Start with the current exhibitor manual. Then confirm any applicable venue procedures, GSC or official-provider instructions, EAC requirements, freight instructions, and event-specific service forms.








